Published in Scientific Papers. Series "Journal of Young Scientist", Vol. 10
Written by Larisa-Nicoleta IVU, Iasmina Patricia TODOR, Andra ARBĂNAȘ
The purpose of the topographical survey was to collect data from the field in order to fully upgrade the electric public transport and improving the non-motorized transport infrastructure in the Municipality of Reșița. The total length of the route that is the subject of this project is 8.5 km, this route includes the following streets: Republic Boulevard, Caransebeșului Route, Timișoarei Route, The December Revolution Boulevard, Ion Luca Caragiale Street, Freedom Street, Traian Lalescu Street, Paul Iorgovici Street and Republic Square. From the route created for the electric transport infrastructure, the paper presents the first section that includes the part of the roundabout that connects with the Intim passage, that crosses over the railway that connects South Reșița and North Reșița. The study presents the following stages in the fulfilment of the project: the stage of organisation necessary for the realisation of the specialised works, the materials and methods used in carrying out the topographic survey, the processing of the data in order to create the topographical technical documentation that will be made available to the designer.
[Read full article] [Citation]