ISSN 2344 – 1283, ISSN CD-ROM 2344 – 1291, ISSN ONLINE 2344 – 1305, ISSN-L 2344 – 1283
 

MONITORING OF BRIDGE OVER THE DANUBE-BLACK SEA CANAL AT AGIGEA

Published in Scientific Papers. Series "Journal of Young Scientist", Vol. 5
Written by Andrei Iulian MIHALACHE, Iosua Andrei PANTEA, Catalina Georgiana LEAHU

Topo-geodetic methods are in many cases the only one methods allowing the absolute determination of the size and direction of the movement of a building or area of land with constructions as well as the determination of the movements and deformation made by other methods.The monitoring of constructions on a timeline is a very complex process, which requires a rigorous planning. In order to be able to diagnose, it is necessary to analyze thoroughly the characteristics of the structure. The paper aimed to present this paper the process of monitoring Agigea is the first cable-stayed bridge made in Romania, and until 2002, span over waterway 162.5 meters was the highest road bridge span from country. Cable-stayed structure is 246.65 meters long.

[Read full article] [Citation]

Find Article

The publisher is not responsible for the opinions published in the Volume. They represent the authors’ point of view.

© 2019 Journal of Young Scientist. All Rights Reserved.

Powered by INTELIDEV