Published in Journal of Young Scientist, Vol.I
Written by George Narcis PELEA
The paper aims presenting the main steps necessary for compiling the documentation for land improvement design. In the land improvement design are distinguished the following main steps: pre-feasibility study (P.F.S.), feasibility study (F.S.), technical design and execution details (P.T.+ D.E.), technical approval (D.T.), technical documentation for obtaining the construction permit (D.T.A.C.), technical expertise, documentation authorizing work intervention (D.A.L.I.). In the case study we will detail the content of a framework for obtaining the technical approval from A.N.I.F. Timis Agency for land improvement in the Western part of the country.
[Read full article] [Citation]